S/V Trinity

Utility Link | Utility Link | Utility Link

TrinityLocks

DSC01514.JPG
Rain gutter on Trinity for the waterline.
DSC01515.JPG
Little blisters on certain segments of the paint.
DSC01516.JPG
Sanding zinc residue and barnacles off the propeller.
DSC01517.JPG
Happy work. At least it's not raining.
DSC01518.JPG
Trinity with a couple of fresh coats of bottom paint.
DSC01519.JPG
Close up of the bottom paint. This was a full three days of work.
DSC01520.JPG
Shot of the aft underside of the boat.
DSC01521.JPG
Our front steps.
DSC01522.JPG
Trinity waiting to go under the Fremont Bridge.
DSC01523.JPG
Backdrop.
DSC01524.JPG
The bridge opens.
DSC01525.JPG
Trinity coming through.
DSC01526.JPG
Going past Roma, under the Aurora Bridge.
DSC01527.JPG
Coming in for a close up. Leif and Gage on the bow.
DSC01528.JPG
Even closer.
DSC01529.JPG
Trinity in profile.
DSC01530.JPG
Going away.
DSC01531.JPG
Roma waiting at the Fremont Bridge for someone else.
DSC01288.JPG
In the large locks, locking down to Shilshole Bay Marina. We're tied to the wall, others are tied to us. Gage took these pictures.
DSC01289.JPG
More locks.
DSC01534.JPG
Locking down. See the water line above? That's where we used to be.
DSC01535.JPG
Leif's job was to keep the wind generator from hitting the wall.
DSC01537.JPG
Radar reflectors on a boat in the locks.
DSC01540.JPG
Roma in the locks.
DSC01541.JPG
Sure hope that wall holds!
DSC01542.JPG
Gage thought this looked like a cave.
DSC01543.JPG
Roma handling the bow line.
DSC01547.JPG
Locks gone down.
DSC01549.JPG
Battery banks were hooked up a bit incorrectly. This caused problems for a few days.
About Us | Search | Contact Us | ©2005 S/V Trinity Productions